We have adopted both the 493ah's and the 450G's for much of our backbone. We purchased Tristar 60 MPPT charge controllers because they have built in ethernet interfaces for monitoring. With the 450G's we have had no problems communicating with the Tristar. However with the 493ah's we never can. We have tried forcing all different modes such as 10Base-T Half, 10Base-T Full, 100Base-T Half, 100Base-T Full with to success.
Our normal configuration is to bridge the port the Tristar is off of with another management port.
Has anyone had similar problems with the 493ah and other devices or similar encounters with the Tristar 60 MPPT that they were able to solve?
Ryan